Circor Pipeline Engineering delivers fast turnaround  

Pump protection and circulate control technology agency Circor Pipeline Engineering has supplied a buyer with a rapid opening closure (ROC) for a 48-in gasoline filter vessel within 10 weeks.
A ROC provides a fast opening entry point to pipelines or strain vessels, for the installation or removal of apparatus.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp giant ROC closure needed to be delivered to the client in Houston, Texas in 10 weeks. เกจวัดแรงดันnuovafima was built and delivered on time using the new giant Vertical Turning Center (VTC) installed in Catterick in 2020 to reduce manufacturing lead time.
Following the delivery, Pipeline Engineering offered support with set up and welding from its Houston facility.
The closure has been equipped with the new CIRCORSmart tag for traceability, doc entry and easy buyer assistance when it goes into operation.
Share

Leave a Comment